Discussion topics

  • When to resume automatic e-mail reminders to observers regarding DEIMOS/LRIS configurations.

  • MKO Science Talks: feedback, what comes next?

  • Cron jobs, electronic logs, koa ingestion: making sure we don’t miss anything

  • [Optional] The future of remote observing, now that the genie is out of the bottle. Preliminary thoughts

  • Detailed plans for Keck II restart of Ops, general plans for Keck I

Time

Item

Presenter

Notes

Time

Item

Presenter

Notes

11:34

Words from Randy / Return to Operations

Randy

  • Plans for return to ops for K2 are taking shape. See Randy’s message in slack.

  • SA for the night on engineering nights should manage situation if many people logging in to Zoom and VNCs.

  • Go right in to science after ~1.5 nights of engineering (Saturday night includes science)

  • Summit activity? Evolving. 6 up yesterday. Max will be 8 for this “level 4” risk environment. Ramping up to 8.

  • Grant and Craig developed a “dashboard” with list of items to check on each telescope. Randy will share in slack.

  • K1 plan? Not definitive. Waiting to see if there are unexpected problems on K2. Will catch up on critical K2 PMs before turning attention to K1. K1 ramp up not before next week sometime.

  • What about cooling instruments? Dwight is developing plan.

  • Slit masks? Probably able to support in June.

  • Getting OK for limited use of HQ and VSQ and RemOps and SA offices. Email to hqserviceorders, gloria, vsq if you plan to use. No use of VSQ commons.

  • Keck 1 plans: sometime net week, it will get attention. Will do 2-4 nights of Engineering. Include KAPA, laser, OSIRIS upgrade, TRICK testing.

    • Check out HIRES and MOSFIRE?

    • Goal of science on May 25th (HIRES/OSIRIS-LGS split night).

  • Jim: lots of work has been done on new AO server on K2, untested on sky so far.

12:02

Words from John

John

  • All staff on Thursday.

  • Manage expectations for return to science.

12:05

Slit Mask Emails

Carlos

  • DEIMOS on sky June 9. When should we re-enable the automatic emails about slit mask and configuration reminders?

  • Carlos will email PIs to warn them that they should plan on mask designs.

  • Then will tell Josh Riley to re-enable

12:10

Remote Observing

Josh

  • SAs should email their observers a few days ahead of time to let them know they may need to set up at home observing if they don’t have access to a remote observing site.

  • Use the policy from before shutdown (talk to Josh if questions).

12:15

Future of Remote Observing

Luca / Josh

  • “Genie is out of the bottle”. How do we put it back in?

  • John will take lead on communicating with community and indicate that “pajama mode” is for crisis only, not regular use.

  • Jim: Try to monitor instrument efficiency to see if it goes down due to user interface limitations.

  • Jim: Do we need a separate night log ticket category?

  • Luca: enable secondary observers in pajama mode? Primary is still at approved site? Slippery slope worries.

  • Will need to figure out when to disable SSH keys.

  • If there is demand, we can leverage that for funding?

12:31

Science Talks

Elena

  • Feedback?

  • Few WMKO staff to do science talks, will ask observers.

  • So far no speakers from other MK observatories.

12:40

Cron jobs, electronic logs, koa ingestion: making sure we don’t miss anything

Luca

  • What has been disabled? Make sure we bring things back up.

  • Slit masks discussed above.

  • KEOLA and KOA will be restarted.

  •  

12:43

Keck 1 restart

Randy

  • K1 restart is still up in the air.

  • May have to back fill some LRIS time.

  • May start before May 25 with another instrument.

  • May need to schedule support.

  • Does support schedule need to be reworked now that conference travel and vacation ravel may be cancelled?

  • There were some coverage difficulties

12:53

MS Teams

Randy

  • Randy contenting to press about getting SAs on Teams committee

12:54

KSM SOC

John

  • @Josh Walawender volunteered to be on SOC

12:55

Pau!

 

 

Action items

All: Consider engineering to test out instruments. Especially HIRES and MOSFIRE on K1.
@Josh Walawender : Put zoom password in showpasswords
@Carlos Alvarez schedule re-enable of slit mask emails with Josh Riley and email DEIMOS observers about mask designs.
@Elena Manjavacas (Unlicensed) Email LRIS observers about mask designs.
@Randy Campbell Will email Friday night’s observer (Karin), but SAs for each night should do that in future nights.

Decisions

Related content

2020-05-26 Meeting notes
2020-05-26 Meeting notes
More like this
2021-06-24 Meeting notes
2021-06-24 Meeting notes
More like this
2020-07-30 Meeting notes
2020-07-30 Meeting notes
More like this
2021-11-11 Meeting notes
2021-11-11 Meeting notes
More like this
2021-06-10 Meeting notes
2021-06-10 Meeting notes
More like this
2021-03-25 Meeting notes
2021-03-25 Meeting notes
More like this